• Tunis Group 1 - CI futur Practicaltasks

  • Considerations around time factor" for 2 issues in the agenda of next IC

    from pierre on Oct 04, 2013 01:40 PM
    English  ( francais bientot  -  espanol pronto )
    
    Dear all 45 in group G1
    
    http://openfsm.net/projects/cifutur/lists/cifutur-practicaltasks/membership
    ****
    
    This message is basically  an invitation to sharing ideas in group G1 on
    "time factor" around wsf2015 build up, and IC future discussion build up,
    two issues which are in the agenda (*) of next IC meeting
    
    it is not giving opinion about  the date of next IC
    
    Decision  about date of IC meeting  is of course with our friends from
    Morrocco who are making this next IC meeting possible
    http://openfsm.net/projects/maghreb-mashrek/csfsmagh-tunis2013-communication-ci
    
    
    Beyond communication of personal availabilies on December or February
    tentative dates,  or preferences (as a few of us did ) ,it may be useful to
    *share considerations around the time factor  on two issues   1/
    preparation wsf2015, and 2/discussion on IC future*
    
    On the first item, inputs of those present ni this group  who are active
    in "initiatives  towards wsf2015" are welcome ! *( Carminda Meena Raphael
    Vijay  ..) *
    
    On the second,  those  (too few...) who are active in group 2 and 3 and
    also present in this group G1 might also want share some thoughts
    
    Warm regards
    
    Pierre
    
    *(*)from tunis discussion it can be understood that the preparation of
    the tentative
    agenda of next ic is in the scope of group G1 - is this understanding
    shared in our group?*
    
    
    *1/ FRAMING AND PREPARATION  OF WSF2015 tunis group G1*
    
    *http://openfsm.net/projects/cifutur/cifuturg1-decision2015 *
    
    *Current situation since tunis:* There so far no discussion held in group
    G1 about the preparation , in july a draft letter about wsf2015 has been
    circulated and raised no comments
    
    Indian WSf2015 initiative is gathering speed with a group of 100
    participants / representatives meeting in lucknow and  outcomes of meetings
    21st and 27th september are expected and also  a meting in delhi 19thOctober
    http://openfsm.net/projects/cifutur/meeting2015-lucknow-2013-minutes
    
    There is an initiative in Quebec with a group willing to involve energies
    of  “new movements” in the preparation of wsf2015 in a polycentric /
    extended perspective around a concentration of activities  in Quebec  - a
    first on conversation was held on line with a limited participation (
    material to be published soon)
    http://openfsm.net/projects/cifutur/cifuturg1-2015quebec-wsf-conversation2015-3
    
    There is no other official announcement of initiative made so far, maybe
    other announcements for initiatives towards WSF2015 might appear before a
    next IC meeting ?
    
    *
    *
    
    *Time factor  on wsf 2015 build up  and  IC meeting dates?*
    
    How much time is needed after a "green light"  given in IC to prepare
    bigger event(s) in wsf 2015?  Usually a long enough notice is given -  in
    case of Tunisia there was a 18 month time (end of 2011 – march 2013)
    
    is a polycentric option helpful  to have a delayed decision making
    process, ? it may introduce other considerations ( simultaneity or not
    etc..) - it may be good to discuss this in the G1 group
    
    Also specific event  build-ups may need less time, according to local
    accumulated collective experience in organizing social forum
    events<http://openfsm.net/projects/organizingwsfevents/project-home>
    **
    
    *December  18 month from mid 2015*–
    
    *February *– *18 month from end of 2015*
    
    
    ****
    
    *2/ DISCUSSION ON FUTURE OF IC INSIDE WSF PROCESS  tunis group G2  and G3*
    
    *Current situation since tunis:*  There is a slow but steady activity in
    progress in the working group  Tunis G2 to stimulate a discussion about IC
    future using  *"WSF IC surveys "* ( one survey has been recently sent on ci
    list) - 5 people have contributed to drafing surveys and about another 10
    have explored those surveys so far
    
    *http://openfsm.net/projects/cifutur/cifuturg2-consultation<http://openfsm.net/projects/cifutur/cifutur-consultations>
    *
    
    There are two texts coming as first inputs in a post tunis discussion about
    wsf process  placed in the space of tunis Group G3, with no other inputs
    nor discussion on the list  so far
    http://openfsm.net/projects/cifutur/cifutur-strategies
    
    
    It is to be noted that WSF process is active enough in 2014 through several
    significant events, some of them might be occasions to host an ic meeting
    after the next one (  Porto alegre  -  Lucknow - Sarajevo  - Canada  -
    Maghreb - ......)
    http://openfsm.net/projects/wsf2012-support/wsf2013-calendar
    
    *Time factor on IC future discussion process and IC meeting  dates?*
    
    *December* – A close enough face to face meeting perspective might stir on
    line discussion /contributions " surge"  on future of IC in group G2 G3
    and on IC plenary list in October/November
    
    *February *-  the one line discussion "surge" may be just delayed  and we
    have another three months of calm on the lists,  or   matures  and grow
    steadily -
    
    ** **