-
Considerations around time factor" for 2 issues in the agenda of next IC
from pierre on Oct 04, 2013 01:40 PMEnglish ( francais bientot - espanol pronto ) Dear all 45 in group G1 http://openfsm.net/projects/cifutur/lists/cifutur-practicaltasks/membership **** This message is basically an invitation to sharing ideas in group G1 on "time factor" around wsf2015 build up, and IC future discussion build up, two issues which are in the agenda (*) of next IC meeting it is not giving opinion about the date of next IC Decision about date of IC meeting is of course with our friends from Morrocco who are making this next IC meeting possible http://openfsm.net/projects/maghreb-mashrek/csfsmagh-tunis2013-communication-ci Beyond communication of personal availabilies on December or February tentative dates, or preferences (as a few of us did ) ,it may be useful to *share considerations around the time factor on two issues 1/ preparation wsf2015, and 2/discussion on IC future* On the first item, inputs of those present ni this group who are active in "initiatives towards wsf2015" are welcome ! *( Carminda Meena Raphael Vijay ..) * On the second, those (too few...) who are active in group 2 and 3 and also present in this group G1 might also want share some thoughts Warm regards Pierre *(*)from tunis discussion it can be understood that the preparation of the tentative agenda of next ic is in the scope of group G1 - is this understanding shared in our group?* *1/ FRAMING AND PREPARATION OF WSF2015 tunis group G1* *http://openfsm.net/projects/cifutur/cifuturg1-decision2015 * *Current situation since tunis:* There so far no discussion held in group G1 about the preparation , in july a draft letter about wsf2015 has been circulated and raised no comments Indian WSf2015 initiative is gathering speed with a group of 100 participants / representatives meeting in lucknow and outcomes of meetings 21st and 27th september are expected and also a meting in delhi 19thOctober http://openfsm.net/projects/cifutur/meeting2015-lucknow-2013-minutes There is an initiative in Quebec with a group willing to involve energies of “new movements” in the preparation of wsf2015 in a polycentric / extended perspective around a concentration of activities in Quebec - a first on conversation was held on line with a limited participation ( material to be published soon) http://openfsm.net/projects/cifutur/cifuturg1-2015quebec-wsf-conversation2015-3 There is no other official announcement of initiative made so far, maybe other announcements for initiatives towards WSF2015 might appear before a next IC meeting ? * * *Time factor on wsf 2015 build up and IC meeting dates?* How much time is needed after a "green light" given in IC to prepare bigger event(s) in wsf 2015? Usually a long enough notice is given - in case of Tunisia there was a 18 month time (end of 2011 – march 2013) is a polycentric option helpful to have a delayed decision making process, ? it may introduce other considerations ( simultaneity or not etc..) - it may be good to discuss this in the G1 group Also specific event build-ups may need less time, according to local accumulated collective experience in organizing social forum events<http://openfsm.net/projects/organizingwsfevents/project-home> ** *December 18 month from mid 2015*– *February *– *18 month from end of 2015* **** *2/ DISCUSSION ON FUTURE OF IC INSIDE WSF PROCESS tunis group G2 and G3* *Current situation since tunis:* There is a slow but steady activity in progress in the working group Tunis G2 to stimulate a discussion about IC future using *"WSF IC surveys "* ( one survey has been recently sent on ci list) - 5 people have contributed to drafing surveys and about another 10 have explored those surveys so far *http://openfsm.net/projects/cifutur/cifuturg2-consultation<http://openfsm.net/projects/cifutur/cifutur-consultations> * There are two texts coming as first inputs in a post tunis discussion about wsf process placed in the space of tunis Group G3, with no other inputs nor discussion on the list so far http://openfsm.net/projects/cifutur/cifutur-strategies It is to be noted that WSF process is active enough in 2014 through several significant events, some of them might be occasions to host an ic meeting after the next one ( Porto alegre - Lucknow - Sarajevo - Canada - Maghreb - ......) http://openfsm.net/projects/wsf2012-support/wsf2013-calendar *Time factor on IC future discussion process and IC meeting dates?* *December* – A close enough face to face meeting perspective might stir on line discussion /contributions " surge" on future of IC in group G2 G3 and on IC plenary list in October/November *February *- the one line discussion "surge" may be just delayed and we have another three months of calm on the lists, or matures and grow steadily - ** **